UEP Gallery

For questions related to any Utilities Extension Project, please call 1-833-227-3837 (833-CAPE-UEP).
1 -Air Valve
2- Catch Basin
Detour Sign_b
Detour_Flagman
3 - Dewatering System - pipe and pump with sound barrier
3 - Dewatering system (3)
7- Drilling
6 - Irrigation Pipe - Pink
Right of way stakes & flags
10- Excavator
11- Grader
12 - Front End Loader- need to crop out water
Master lift stations complete 2
Manhole Install
17-Meter Boxes (2)
12 - Asphalt Placement
7 - Potable Water Pipe - Blue
13-Pulverizing Equipment
18- Sewer Pipes
4 - Sewer Installation (2)
Misc - Contractor Staging Yard (2)
9 - Storm Water Pipe
22 - Trench Box
23-Valve